SPE Extrusion Division 1-0-Wiki

RSS

Navigation

Extrusion 1-0-Wiki Pages

Quick Search

Quick searches only Titles
Advanced Search »
Advanced searches all text.


Viewing/Creating

Account Management

Administration

Brought to you by:
The SPE Extrusion Division
Board of Directors
Image
and
PoweredBy
Screen changing with a continuous screen changer Vol.21 #1, June 1994





Many customers are concerned with when to make a screen change when utilizing a unit designed for continuous operation of the extrusion process. Upon examination of the pressure loss curves typical through a screen pack over time, it is obvious that the largest pressure build up occurs during the last 20 percent of useable screen life.



For this reason, it is imperative that a screen change be made before the pressure buildup begins to increase sharply. Doing this will result in only a slightly shorter screen life cycle but will greatly decrease the probability of a process upset from the pressure drop from new screens.



See also

Assembling a screen pack

Bolt cleaning

Screen packs 1

Screen packs 2

Screen utilization

ScrewTurn Wiki version 2.0.35. Some of the icons created by FamFamFam.